BONGABONG RIP CY 2018 PACKAGE 4: Construction of Main Canal (STA.4+060-STA.5+926.80) including Supply, Delivery, Installation and Commisioning of Steel Gates and its Appurtenant Structures |
BONGABONG RIP CY 2018 PACKAGE 4 - CONTRACT.pdf |
R4B-MMR-BONGABONG4-28M-CY18-06 |
CONSTRUCTION OF CY 2022 SUMBILING SMALL IRRIGATION PROJECT: SLOPE PROTECTION, CANAL LINING, AND CANAL STRUCTURES |
CY 2022 SUMBILING SIP - CONTRACT AGREEMENT.pdf |
R4B-PALIMO-SMBLING-42M-CY22-001 |
CALAMITY REPAIR OF BATANG-BATANG RIS: Construction of Slope Protection and Canal Lining |
BATANG-BATANG RIS - CONTRACT AGREEMENT.pdf |
R4B-PALIMO-BTNGBTNG-33.369M-CY23-001 |
EXTENSION OF ROOF, REPAIR AND PAINTING OF REAR SIDE OF ADMINISTRATIVE BUILDING |
CONTRACT AGREEMENT FOR EXTENSION OF ROOF.pdf |
R4B-REGION-EXTNSN-1.5M-CY23-002 |
CONSTRUCTION OF CY 2019 BONGABONG RIP (PACKAGE 2) |
BRIP 2019 P2 Contract.pdf |
R4B-MMR-BRIP2-49M-CY19-06 |
CONSTRUCTION OF CY 2019 BONGABONG RIP (PACKAGE 1) |
BRIP 2019 P1 Contract.pdf |
R4B-MMR-BRIP1-48M-CY19-05 |
SUPPLY AND DELIVERY OF IT EQUIPMENT |
IT EQUIPMENT Contract.pdf |
R4B-REGION-ITEQPT-2.087M-CY22-009 |
CY 2022 BAGTINGON SRIP: IRRIGATION FACILITIES AND ITS APPURTENANT STRUCTURES |
BAGTINGON Contract.pdf |
R4B-MOMARO-BGTNSRIP-100M-CY22-007 |
CONSTRUCTION OF CY2019 BONGABONG RIP (PACKAGE 7) |
Bongabong PKG7 CONTRACT AGREEMENT.pdf |
R4B-MMR-BRIP7-24M-CY19-11 |
CONSTUCTION OF CY 2019 BONGABONG RIP (PACKAGE 4) |
Bongabong PKG4 CONTRACT AGREEMENT.pdf |
R4B-MMR-BRIP4-41M-CY19-08 |